Design & Engineering Services For Designing Of 62M High Steel Chimney
We must let go of the life we have planned, so as to accept
the one that is waiting for us.
We must let go of the life we have planned, so as to accept
the one that is waiting for us.
➢ Foundation of Brake-I, Brake-II and Brake-III for KILN.
➢ Foundation of A & B for cooler.
➢ Foundation of after Burner.
➢ Foundation of RPC feeding structure and CPC Silos.
➢ Foundation of cooler accessories reference Drawing
No.: G-0001-1C-7.
➢ Foundation of structures where load data are given in the drawing.
➢ Vetting of chimney foundation already constructed at the site.
➢ Design a 200ft high chimney.
➢ Preparation of drawings for the chimney.